Reno Log: Day 132

Reno Log: Day 132

WE FINALLY PASSED INSPECTION!!!!! Only took 4 attempts!  Considering I made such a huge stink with the county about their initial terrible inspection, I can't complain about how particular the chief residential inspector was.  The amazing plumbers from Marines Plumbing had to replace EVERY SINGLE piece of pipe that the no good, very bad, terrible [...]

Foyer, Part Deux

Foyer, Part Deux

November 2016.  We moved in.  Since then I have been dreaming, thinking, measuring, Pinteresting, drawing, Googling, budgeting about how this house should and could be.  Not just how it should look, but how it should function.  There were parts of the layout that made me mad, like angry!  Why is a pantry across from accordion [...]